Rodwin Architecture
  • RESIDENTIAL
  • COMMERCIAL
  • ABOUT
  • GREEN BUILDING
  • BLOG
  • CONTACT

  • RESIDENTIAL
  • COMMERCIAL
  • ABOUT
  • GREEN BUILDING
  • BLOG
  • CONTACT

Rodwin Architecture


Tara Performing Arts Institute

tara

 

  • Image 1
  • Image 2
  • Image 3
  • Image 4
  • Image 5
  • Image 6
  • Image 7
  • Image 8
  • Image 9
  • Image 10
  • Image 11
  • Image 12

 

We master-planned this extraordinary Waldorf school back in 2003 and completed construction of Phase 1, the conversion of an existing house into classrooms, offices and common rooms, in 2005. Recently we completed Phase 2, the addition of three classrooms, bathrooms and a science lab. Phase 3 will be a large multipurpose performance building. Principal Scott Rodwin has been teaching a “Sustainable Architecture” design studio there for the last 8 years, and the campus is being designed in accordance with the green principals he teaches his students.

Built by Skycastle Construction.

 

 

Back to Commercial

Prev / Next

929 Pearl Street Suite 250 :: Boulder, CO 80302 303.413.8556


RESIDENTIAL

COMMERCIAL

ABOUT

GREEN BUILDING

BLOG

CONTACT